CFR Long-Term Remedy Performance Monitoring Report #3 July – September 2023
This CFR Long-Term Remedy Performance Monitoring Report #3 (“Report”) has been prepared for the Q3 2023 period of July 1 through September 30, 2023 and documents the continued operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).