搜索结果

以下是您查询的搜索引擎结果。

显示中 1791-18002505 结果

WWTP TABLE 3+ PFAS LOADING ASSESSMENT

This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) pursuant to the requirements of Paragraph 4(d) of the Addendum to Consent Order Paragraph 12 (CO Addendum) amongst Chemours, the North Carolina Department of Environmental Quality (NCDEQ), and Cape Fear River Watch.

Interim Four Counties Sampling and Drinking Water Plan (New Hanover, Brunswick, Columbus and Pender Counties)

This Interim Four Counties Sampling and Drinking Water Plan has been prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours).

Interim Four Counties Sampling and Drinking Water Plan (New Hanover, Brunswick, Columbus and Pender Counties)

This Interim Four Counties Sampling and Drinking Water Plan has been prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours).

Groundwater and SEEPS remediation Report #1 January - March 2023

This Groundwater and Seeps Remediation Report #1 (“Report”) has been prepared to document the commissioning and startup activities of the groundwater extraction and conveyance system (GWEC) and the groundwater treatment plant (GWTP) from the period of January 1 through March 31, 2023.

Interim SEEP Remediation Operation and Maintenance Report #10

This Operations and Maintenance Report #10 (O&M Report #10) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from July 1 through August 31, 2022.

Interim SEEP Remediation Operation and Maintenance Report #14

This Operations and Maintenance Report #14 (O&M Report #14) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from March 1 through April 30, 2023.

Interim SEEP Remediation Operation and Maintenance Report #4

This Operations and Maintenance Report #4 (O&M Report #4) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from July 1 through August 31, 2021.

Interim SEEP Remediation Operation and Maintenance Report #6

This Operations and Maintenance Report #6 (O&M Report #6) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from November 1 through December 31, 2021.

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER Quarterly Report #2

This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a quarterly update on the identification and concentrations of per- and polyfluoroalkyl substances (“PFAS”) in process wastewater, non-process wastewater, and stormwater at the Chemours Fayetteville Works, North Carolina site

Lancaster Table 3 SOP w PFHpA redacted June 2020

T-PFAS-WI20127