搜索结果

以下是您查询的搜索引擎结果。

显示中 1261-12702426 结果

Submission of Barrier Wall and Groundwater Extraction System 90% Design Report, Chemours Fayetteville Works, Fayetteville, NC

Chemours is submitting the Barrier Wall and Groundwater Extraction System 90% Design Report.

Chemours pleegt vanaf september groot onderhoud aan fabrieken

Belangrijke onderhoudsstop voor verantwoorde en veilige productie duurt enkele maanden

Cape Fear River PFAS Mass Loading Assessment - Fourth Quarter 2022 Report

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours).

Chemours hosted Open House for Community Leaders

Submission Pursuant to Consent Order Paragraph 8 March 4, 2019

Pursuant to Paragraph 8.b.i of the Consent Order, please find enclosed the final reports from Weston Solutions, Inc. (“Weston”) for the emissions testing of GenX Compounds at the Division, Polymers, and Semi-Works stacks conducted at Fayetteville Works in mid-January 2019

Notification Pursuant to Proposed Consent Order Paragraph 7.b.ii

Pursuant to the requirements of Paragraph 7.b.ii of the proposed Consent Order, Chemours is notifying the Division of Air Quality of completion of installation of the “Vinyl Ethers North Carbon Adsorber Project.”

Interim Seep Remediation Operation and Maintenance Report #11

Interim Seep Remediation Operation and Maintenance Report #11

Submission of Thermal Oxidizer Emission Test Reports Pursuant to Consent Order Paragraph 8.c.i April 3, 2020

By letter dated March 30, 2020, Chemours submitted the Thermal Oxidizer Performance Test Report, with attached efficiency test reports for testing events.

Consent Order Addendum - Submission Pursuant to Paragraph 4(d) November 30, 2020

Paragraph 4(d) of the Addendum to Consent Order Paragraph 12 requires that Chemours complete an investigation to determine whether DuPont non-contact cooling water is causing groundwater containing PFAS to infiltrate into the outfall channel.

Stormwater Pollution Prevention Plan for: Chemours Fayetteville Works

SWPPP Preparation Date: 05/31/2020